To be issued a set-up permit all manufactured homes must be in compliance with the
installation standards set forth in article III of chapter 10 of the Code, and must have been constructed or manufactured on a date not more than
20 years prior to the date of the manufactured home's initial placement or relocation
within the city and have exterior siding material of wood, vinyl or stucco, or material
equivalent in appearance, and skirting material of stucco, or material similar in
appearance, or vinyl skirting in good repair that is compatible with the home. Proof
of construction or manufacture date must be provided at the time of application for
a set-up permit.
(Ord. No. 14-03, § 5, 4-15-2014)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');