§ 46-30. Inspections.  


Latest version.
  • A minimum of three inspections shall take place. First, the permittee shall request that the city conduct a pre-construction inspection, to determine any necessary conditions for the permit. Second, the permittee shall notify the city 48 hours prior to the commencement of work operations at which time the city shall schedule an inspection. The city shall inspect the completed work and acceptance will be made if all work meets city and permit standards. Third, approximately 30 days prior to the expiration of the two-year guarantee, the city may conduct a post-construction inspection of the completed work. If the work is still satisfactory the bond or letter of credit shall be returned or allowed to expire, with a letter of final acceptance, less any amounts needed to complete work not done by permittee. Upon review of the application for a permit, the director shall determine how many additional inspections, if any, may be required. For work which does not involve material disturbance in the rights-of-way, the director shall waive the final inspection and the performance bond/letter of credit.

(Ord. No. 18-06, § 1, 4-17-2018)